Project Description

Main Client: Golgohar Mining and Industrial Co
Client: ّ Fakoor Sanat
Main Contractor: MSV
Project Period: 2022

The aim of this project is to improve the quality and capacity of Golgohar Line 5, 6 & 7 concentrate to 2.100.000 TPA. Fakoor sanat is the EPC contractor.

Farzan Fan Andish and Rastak Pouya companies are the subcontractor of Electrical, Control and Instrumentation systems. Our scope of work includes (but not limited to)

    • Installation of Power Transformers
    • Installation and commissioning of MV and LV switchgears
    • Cable Pulling and Connection
    • Installation and Commissioning of Control Panels
    • Installation of Field Instruments
    • Installation of CCTV
    • Installation of Fire alarm System
    • Installation of Grounding and Lightning system