info@Rastakco.com
Saturday to Wednesday
Main Client: | Golgohar Mining and Industrial Co |
Client: | ّ Fakoor Sanat |
Main Contractor: | MSV |
Project Period: | 2022 |
The aim of this project is to improve the quality and capacity of Golgohar Line 5, 6 & 7 concentrate to 2.100.000 TPA. Fakoor sanat is the EPC contractor.
Farzan Fan Andish and Rastak Pouya companies are the subcontractor of Electrical, Control and Instrumentation systems. Our scope of work includes (but not limited to)