Scope of Work:
Engineering, Installation and Commissioning (EC) of Electrical BOP of Chabahar Gas Power Plant, including:
- Detail Design, Installation and Commissioning of MV and LV Swithgears
- Detail Design, Installation and Commissioning of UPS, Charger and AC/DC Panels
- Engineering of Power and Control Cables
- Cable pulling and Connection
- Engineering and Installation of Cable Ladder, Tray and Accessories
- Engineering and Installation of Secondary Earthing and Lightning System
- Installation and Commissioning of Diesel Generators
- Installation and Commissioning of Communication Systems