Project Description

Main Client: TPPH
Client: Mapna MD1
Main Contractor: TMB
Project Period: 2008-09
Scope of Work:
Engineering, Installation and Commissioning (EC) of Electrical BOP of  Chabahar Gas Power Plant, including:

  • Detail Design, Installation and Commissioning of MV and LV Swithgears
  • Detail Design, Installation and Commissioning of UPS, Charger and AC/DC Panels
  • Engineering of Power and Control Cables
  • Cable pulling and Connection
  • Engineering and Installation of Cable Ladder, Tray and Accessories
  • Engineering and Installation of Secondary Earthing and Lightning System
  • Installation and Commissioning of Diesel Generators
  • Installation and Commissioning of Communication Systems