Project Description

Main Client: Thermal Heat Power Plant Holding (TPPH)
Client: Mapna Group
Main Contractor: Mapna MD3
Project Period: 2019-20

 Hengam Combined Cycle Power Plant includes Two Gas units (class F) and one Steam Unit with 906 MW nominal power capacity. The power plant is under construction by Mapna MD3 in BandarAbbas (south of Iran). 

Rastak Pouya Co. as the Electrical and Instrumentation contractor is responsible for installation and pre-commissioning of Power Block and Electrical Balance of  Plant (BOP).


Our scope of work in Power Block includes

  • Installation and Pre-commissioning of PCC containers (made by Siemens and MECO)
  •  Instantiation  of MV Busduct
  • Installation of Generator Circuit Breaker (GCB)
  • Installation and Precommissioning of Aux. Transformers
  • Installation of Field Instruments
  • Installation of Cable Trays, Ladders and Accessories
  • Cable pulling and Connection
  • Earthing

Our scope of work in BOP includes

  • Installation and Pre-commissioning of MV and LV Switchgears
  • Installation and Commissioning of Batteries, Battery Charger, UPS and AC/DC Panels
  • Installation of two sets of Emergence Diesel Generators
  • Installation of Cable Trays, Ladders and accessoris
  • Cable pulling and Connection
  • Earthing system
  • Fire Stop