Main Client: | Thermal Heat Power Plant Holding (TPPH) |
Client: | Mapna Group |
Main Contractor: | Mapna MD3 |
Project Period: | 2019-20 |
Hengam Combined Cycle Power Plant includes Two Gas units (class F) and one Steam Unit with 906 MW nominal power capacity. The power plant is under construction by Mapna MD3 in BandarAbbas (south of Iran).
Rastak Pouya Co. as the Electrical and Instrumentation contractor is responsible for installation and pre-commissioning of Power Block and Electrical Balance of Plant (BOP).
Our scope of work in Power Block includes
Our scope of work in BOP includes