Project Description

Main Client: Golgohar Mining and Industrial Co
Client: Fakoor Sanat
Main Contractor: MSV
Project Period: 2021-22

The aim of this project was to improve the quality and capacity of Golgohar Line 4 concentrate to 650.000 TPA. Fakoor sanat was the EPC contractor.

Farzan Fan Andish and Rastak Pouya companies were the subcontractor of Electrical, Control and Instrumentation systems. Our scope of work included (but not limited to)::

  • Installation and commissioning of Power Transformers
  • Installation and commissioning of MV and LV switchgears
  • Cable Pulling and Connection
  • Installation and Commissioning of Control Panels
  • Installation of Field Instruments
  • Installation of CCTV
  • Installation of Grounding and Lightning system