Main Client: | Golgohar Mining and Industrial Co |
Client: | Fakoor Sanat |
Main Contractor: | MSV |
Project Period: | 2021-22 |
The aim of this project was to improve the quality and capacity of Golgohar Line 4 concentrate to 650.000 TPA. Fakoor sanat was the EPC contractor.
Farzan Fan Andish and Rastak Pouya companies were the subcontractor of Electrical, Control and Instrumentation systems. Our scope of work included (but not limited to)::