Main Client: | SADAF Petrochemical Co. |
Client: | JahanPars |
Main Contractor: | Rastak Pouya |
Project Period: | 2021-22 |
The Sadaf Petrochemical Project in the Persian Gulf is the largest elastomer production complex in the country and the region, with the goal of producing 136,000 tons of styrene butadiene rubber annually and with the prospect of supplying domestic and global markets.
Currently, in November, 1402 projects are being implemented with the talent of 330 direct and indirect personnel with a physical progress of 57%.
According to the plans of the main employer, this project should be put into operation by the end of 1402
Scope of Work:
Installation and Pre-commissioning of Electrical and Instrumentation Systems for whole plant, including (but not limited to):
Installation of Cathodic Protection and Heat Tracing system