Project Description

Main Client: Farab
Client: Farab
Main Contractor: Farab Construction Company
Project Period: 2017-19

Scope of Work:

Installation and Commissioning of Electrical BOP, including:


  • Installation and Commissioning of Common MV Switchgear
  • Installation and Commissioning of LV Switchgears
  • Installation and Pre-commissioning of Control Panels
  • Calibration, Installation and commissioning of Field Instruments and Hook-up Material
  • MV, LV and I&C Cable pulling and Termination (160 Km)
  • Installation of Cable Ladder, Tray and accessories
  • Installation and Commissioning of Heat Tracing system
  • Installation and commissioning of Cathodic Protection system
  • Installation and Commissioning of Fire Alarm system
  • Installation and Commissioning of Telephone, Paging,  Fire Telephone  and LAN systems
  • Installation and Commissioning of Emergency Diesel Generators (2 Sets)
  • Supervision on Commissioning for Utility Systems (Fuel System, HVAC, Fire Fighting, Raw Water, Aux. Cooling, Aux. Boiler, Foam, etc.)