Project Description

Main Client: Petro Kaveh Group
Client: Petro Kaveh Group
Main Contractor: Rastak Pouya
Project Period: 2024

With a smart understanding of the future of the energy industry, Kaveh Glass Industrial Group entered the field of investment, engineering and implementation of clean renewable solar and wind power plants across the country since 1402. A grand vision was formulated in 1403 with the goal of implementing 3600 MW of solar power plants and 2620 MW of wind power plants in this complex; a figure that is approximately 5 times the current production capacity of the entire country in these two areas.

The main equipment of the power plant, including panels, inverters, structures, etc., was supplied by the employer from China.

Rastak Pouya Engineering Company, as the executive contractor, was responsible for installing 17.5 MW of equipment from this power plant, which was completed within 3 months to the satisfaction of the employer.

The company also constructed a 63 kV transmission line to connect the power plant to the grid.